Wednesday, February 27, 2008
DAY 4
DAY 4 As scheduled, we had our interim 1 at 930AM. The group met earlier to finalize our pre production paper work to be presented. There were amendments done to the script after the interim and we are curently still sourcing for extras. Currently, the extras would be weasely and kym, sitting in as guests. For the main casts, we are still looking into the choices available and depending our schedule based on the limited talents availabilty. We now have several kid actors, 2 from Jun kai's scouts and the other, fiona's niece. Which talent we choose will depend on how well the kid acts. After discussion, we loaned out the equipments and tested them. All were functioning well except one of the 3 setchler we borrowed. Since we decided that we can make do with 2 out of the 3 setchler lights, we cabbed all our equipments down to JK's place and called it a day. ![]() |