Wednesday, March 5, 2008
DAY 10

DAY 10
the group had another discussion regarding the new idea. We tried to cut down on our previous mistake by trying to have more shot sizes for each scene as well as a slightly longer story line to at least reach the 4 mins minimum requirement.
while some are still doing the rough storyboard as well as script, van and myself went to hunt down for location within the school premises. We are currently short of time to rece outside locations and the rainy season had been a major restrictions for us to shoot outdoors. we have checked the weather forecast and it is predicted to be rainy for the days to come. The group decides that it would be easier if we had an indoor shoot within the school.

so, we came up with the locations for various scene. The classroom area ( 03-10 ) , the stadium, fitness corner, as well as the long corridor at engineering school. Considering that the other schools are mostly on holidays, we can have lesser crowd to make the filming process esier
and at the end of today, the group still have alot of documentations to be done. we have to speed things up.

Profile.
Photobucket Nuratika Bte Aziz
0605111D
MOIP2
Production-Journals
Tag.



Links.
Ain
Amy
Bernard
Kong
Li ying
Mark
Mei Mei
rachel
subha
Tina
Van
Verm
Wei Xiang
Yj
Yumi